|
Country |
Date |
Summary |
Deadline |
| 1541. |
Turkey |
18-06-2026 |
Retaining Wall, Curb, Railing, And Lighting Pole Works Will Be Carried Out. |
06-07-2026 |
| 1542. |
Kazakhstan |
18-06-2026 |
Development Of The Psd Reconstruction Of K. Donenbaeva Street From Land Plot No. 25a To N. Nazarbayev Avenue |
25-06-2026 |
| 1543. |
Russian federation |
18-06-2026 |
Replacement Of The Football Field Surface On The Territory Of Municipal Budgetary Educational Institution Secondary School No. 17 At The Address: Tver, St. Mussorgskogo, 5 |
25-06-2026 |
| 1544. |
Turkey |
18-06-2026 |
Sewerage, Stormwater, And Drinking Water Line Works Will Be Carried Out. |
13-07-2026 |
| 1545. |
Turkey |
18-06-2026 |
A Work Cabin Will Be Made. |
22-07-2026 |
| 1546. |
Russian federation |
18-06-2026 |
Demolition Of The Building Located At The Address: Yakutsk, St. Gagarina, 2 For The Object integrated Development Of The Airport Territory |
26-06-2026 |
| 1547. |
Afghanistan |
18-06-2026 |
Construction And Development Of Ground B & C Of Kabul International Cricket Complex |
01-07-2026 |
| 1548. |
Turkey |
18-06-2026 |
The Work Will Be Done Without Any Issues. |
02-07-2026 |
| 1549. |
Kazakhstan |
18-06-2026 |
Repair Of Other General Purpose Equipment
|
23-06-2026 |
| 1550. |
Afghanistan |
18-06-2026 |
Procurement And Activation Of A 20 Kv Sochgir Panel For The Input Feeder Of Gardiz Substation |
01-07-2026 |
| 1551. |
Turkey |
18-06-2026 |
Repair Work Will Be Carried Out. |
03-07-2026 |
| 1552. |
Kazakhstan |
18-06-2026 |
Materials For Current Repairs Of The Heating Point Building At Km 1037. Beyneu Distance (repeat 2) |
23-06-2026 |
| 1553. |
Turkey |
18-06-2026 |
Flooring Works Will Be Carried Out |
25-06-2026 |
| 1554. |
Turkey |
18-06-2026 |
The Drinking Water Pumping Construction Work Will Be Tendered. |
02-07-2026 |
| 1555. |
Turkey |
18-06-2026 |
The Work Will Be Done Without Any Issues. |
09-07-2026 |
| 1556. |
Afghanistan |
18-06-2026 |
Nfra-cli Construction Of Sohbat Stone Masonry Pw,lab Ab Bala Gabion Pw,sohbat Pa
open In A New Window |
14-07-2026 |
| 1557. |
Turkey |
18-06-2026 |
School Maintenance And Repair Will Be Done |
03-07-2026 |
| 1558. |
Turkey |
18-06-2026 |
The Work Will Be Done Without Any Issues. |
10-07-2026 |
| 1559. |
Turkey |
18-06-2026 |
Paving Work With Locked Paving Stones Will Be Done. |
01-07-2026 |
| 1560. |
Afghanistan |
18-06-2026 |
Request For Rehabilitation Of Bangala Secondary School (ohw- Itb-ohw-blk-itb-26-01) |
27-06-2026 |
| 1561. |
Afghanistan |
18-06-2026 |
Request For Rehabilitation Of Tokhi Secondary School (ohw- Itb-ohw-blk-itb-26-03) |
27-06-2026 |
| 1562. |
Afghanistan |
18-06-2026 |
Request For Rehabilitation Of Zadyan School (ohw- Itb-ohw-blk-itb-26-04) |
27-06-2026 |
| 1563. |
Afghanistan |
18-06-2026 |
Announcement Of Tender For Repair Construction Project Of Surkhab, Waterpump 1, Waterpump 2, And 480 Siphons |
05-07-2026 |
| 1564. |
Afghanistan |
18-06-2026 |
Construction Of (hybrid Modality) Protection Wall, Check Dam And Super Passage - Ghazni Province |
09-07-2026 |
| 1565. |
Afghanistan |
18-06-2026 |
Request For Rehabilitation Of Taligak High School (ohw- Itb-ohw-blk-itb-26-02) |
27-06-2026 |
| 1566. |
Kazakhstan |
18-06-2026 |
Paint (ods 40-3529) |
25-06-2026 |
| 1567. |
Afghanistan |
18-06-2026 |
The Project Of Purchase Of Equipment And Activation Of The Secada Substation System In Geza Gil And Purchase Of Equipment And Activation Of The System |
02-07-2026 |
| 1568. |
Turkey |
18-06-2026 |
Plumbing Work Will Be Done. |
01-07-2026 |
| 1569. |
Lithuania |
18-06-2026 |
Reconstruction Of Heat Supply Networks In The Town Of Skaidiškes (quarter Renovation) |
24-06-2026 |
| 1570. |
Afghanistan |
18-06-2026 |
Construction Services For Boundary Wall And Guard Room Of Cold Storages |
29-06-2026 |
| 1571. |
Russian federation |
18-06-2026 |
Carrying Out Work On The Repair Of Bathrooms And Shower Rooms At The Address: St. Petersburg, 10th Sovetskaya St., 23, Lit. N |
26-06-2026 |
| 1572. |
Pakistan |
18-06-2026 |
Renovation Tabba Washroom 2nd Phase Iba Main Campus |
08-07-2026 |
| 1573. |
Afghanistan |
18-06-2026 |
Supply Of Medonic Analyzer Diluent (rfid) And Medonic Analyzer Lyse For Bamyan Hospital; Renovation Works At Dasht-e-safed Bhc, Bayani Bhc, And Shah Foladi Chc, Bamyan Province. Medonic Analyzer Diluent (rfid), Medonic Analyzer Lyse |
23-06-2026 |
| 1574. |
Afghanistan |
18-06-2026 |
Construction Of Wash Intervention In Charshanghu At Dawlat Abad – Faryab Province |
01-07-2026 |
| 1575. |
Turkey |
18-06-2026 |
The Construction Will Be Carried Out. |
09-07-2026 |
| 1576. |
Kazakhstan |
18-06-2026 |
Current Repair Of The Building Of The Temporary Detention Facility In The Zhanaarkinsky District |
23-06-2026 |
| 1577. |
Turkey |
18-06-2026 |
The Work Of Renovation And Repair Will Be Tendered. |
26-06-2026 |
| 1578. |
Turkey |
18-06-2026 |
The Renovation Will Be Carried Out. |
26-06-2026 |
| 1579. |
Turkey |
18-06-2026 |
The Work Of Renovation And Repair Will Be Tendered. |
07-07-2026 |
| 1580. |
Kazakhstan |
18-06-2026 |
Pipe St. 12x18n10t F 51x3mm |
23-06-2026 |
| 1581. |
Afghanistan |
18-06-2026 |
Package # 28 – Af2 Wsm: Construction Of 2 Check Dams Of 1. Chatqa Sai In Dahna-e-ghori, And 2. Tahiryan In The Baghlan Markazi District Of Baghlan Province, Northeast/kunduz Regional Office Of Afghanistan.
open In A New Window |
01-07-2026 |
| 1582. |
Turkey |
18-06-2026 |
Intersection Arrangement Work Will Be Carried Out |
09-07-2026 |
| 1583. |
Turkey |
18-06-2026 |
Repair Work Will Be Carried Out At The Public Education Centers. |
26-06-2026 |
| 1584. |
Turkey |
18-06-2026 |
Installation Work Will Be Carried Out. |
13-07-2026 |
| 1585. |
Kazakhstan |
18-06-2026 |
Pvc Drainage Pipe, Diameter 51-100 Mm Steel Water And Gas Pipe, Diameter 100.1-150 Mm T General Purpose Polyethylene Pipe, Diameter 101-150 Mm |
24-06-2026 |
| 1586. |
Pakistan |
18-06-2026 |
Wireless Access Points For Head Office And Divisional Offices. |
07-07-2026 |
| 1587. |
Afghanistan |
18-06-2026 |
Survey, Design, Provision Of Equipment, Installation, Testing And Commissioning Of The 220 Kv Transmission Line Project, Connection From The Arghandi-ghazni Line To Wardak Maidan Substation, 9.3 Km Long. |
28-06-2026 |
| 1588. |
Kazakhstan |
18-06-2026 |
Wooden Fencing |
24-06-2026 |
| 1589. |
Afghanistan |
18-06-2026 |
The Project Of Design, Supply, Construction, Installation, Testing And Commissioning Of 40mva Switching Station And Substation In Yatimtaq Area In Order To Transfer Energy From Gas Plants In Jawzjan Province. |
04-07-2026 |
| 1590. |
Kazakhstan |
18-06-2026 |
Pipe For Gas Pipelines |
24-06-2026 |
|
Page Size
|
prev
Next
|