Loading..

11921 Active Tenders For CIS Region

 

Tenders From Energy, Power And Electrical

Loading Data Please Wait...
Total No Of Tenders - 4671
Country Date Summary Deadline
311. Russian federation 25-06-2025 Construction Of A 0.4 Kv Power Transmission Line From The 0.4 Kv Busbar Section Of The Ktp Sk 704 To The Boundary Of The Land Plot Of Ip Kondyana E.v. In The Pokhvistnevsky District Of The Village Of Savrukha With The Installation Of A Metering System (tu 03-07-2025
312. Russian federation 25-06-2025 Construction Of A 10 Kv Power Transmission Line From The 10 Kv Power Transmission Line Support F-2 Ps 110/35/10 Dubovy Umet With Installation Of A Metering System In The Volzhsky 03-07-2025
313. Russian federation 25-06-2025 Construction Of 10 Kv Cable Line From 10 Kv Switchgear Tp-946 To 10 Kv Switchgear Tp-671 To Replace The Liquidated 10 Kv Cable Line From Tp-1642 30-06-2025
314. Russian federation 25-06-2025 Construction Of A 6 Kv Transmission Line From The 6 Kv Transmission Line Support Ps Lopatino F-24 To The Newly Installed 6/0.4 Kv Transformer Substation, Installation Of A 6/0.4 Kv Transformer Substation, Construction Of A 0.4 Kv Transmission 02-07-2025
315. Russian federation 25-06-2025 Construction Of A 6 Kv Transmission Line From The Tr701/86 Support Of The 6 Kv Vl F-7 Ps 35/6 Kv "troitskaya", With The Installation Of A 6/0.4 Kv Ktp And The Installation Of A 0.4 Kv Transmission Line From The 0.4 Kv Switchgear Of The Designed 6/0.4 Kv K 02-07-2025
316. Russian federation 25-06-2025 Construction Of A 0.4 Kv Transmission Line From The Existing Support Of The 0.4 Kv Transmission Line No. 103/1 Feeder No. 1, Ktp Kyar-366/250 To The Boundaries Of The Applicant's Site In The Krasnoyarsk District 02-07-2025
317. Russian federation 25-06-2025 Construction Of A 6 Kv Overhead Power Line From The Kir604/8 Support, 35/6 Kv Kirpichnaya Substation, With The Installation Of A 6/0.4 Kv Transformer Substation And The Installation Of A 0.4 Kv Overhead Power Line From The 0.4 Kv Switchgear 03-07-2025
318. Russian federation 25-06-2025 Reconstruction, In Terms Of Replacing The Yag2226/160 Kva Ktp With The Yag2226/400 Kva Ktp, Construction Of A 0.4 Kv Overhead Line From The 0.4 Kv Switchgear Of The Yag2226/400 Kva Ktp, Stavropolsky 03-07-2025
319. Russian federation 25-06-2025 "construction And Installation Work. Construction Of 10 Kv Power Line From 10 Kv Power Line No. 23 "nizhnyaya Elyuzan" In The Village Of Nizhnyaya Elyuzan, Gorodischensky District (ip Deberdeeva S.d.) (255811_30)" 02-07-2025
320. Kazakhstan 25-06-2025 Acquisition Of Electrical Goods (read The Technical Specification)/ 30-06-2025
Page Size prev        Next