|
Country |
Date |
Summary |
Deadline |
| 541. |
Kazakhstan |
23-06-2026 |
Development Of Preliminary Designs For redevelopment Of A Garage For 50 Cars And fire Automatics For A Garage For 50 Cars Of Jsc ekibastuz Gres-2 Station |
30-06-2026 |
| 542. |
Russian federation |
23-06-2026 |
The Right To Enter Into An Agreement For The Supply Of Low-voltage Connectors And Accessories For Them |
26-06-2026 |
| 543. |
Kazakhstan |
23-06-2026 |
Current Repair Of The Roof And Facade Of The Rural Culture House In Naumovka Village, Akkol District |
25-06-2026 |
| 544. |
Turkey |
23-06-2026 |
The Construction Of Single-layer Coated Surface Pavement Works On Neighborhood Roads. |
13-07-2026 |
| 545. |
Turkey |
23-06-2026 |
Will Be Renovated |
30-06-2026 |
| 546. |
Turkey |
23-06-2026 |
Repair Work Will Be Carried Out. |
01-07-2026 |
| 547. |
Turkey |
23-06-2026 |
Landscaping Work Will Be Carried Out. |
30-06-2026 |
| 548. |
Kazakhstan |
23-06-2026 |
Oil-based White Paint For Painting Work Outside The Kindergarten |
24-06-2026 |
| 549. |
Turkey |
23-06-2026 |
The Work Of Establishing A Climate System Will Be Carried Out. |
29-06-2026 |
| 550. |
Kazakhstan |
23-06-2026 |
Service For Flushing And Pressure Testing Of The Heating System |
24-06-2026 |
| 551. |
Kazakhstan |
23-06-2026 |
Repair Work On Electrolysis Polypropylene Baths |
29-06-2026 |
| 552. |
Turkey |
23-06-2026 |
The Work Will Be Done Without Any Issues. |
14-07-2026 |
| 553. |
Kazakhstan |
23-06-2026 |
Services For Conducting Aerodynamic Tests Of Ventilation Systems Of Objects In Aktau, Zhetybaymunaigas And Kalamkasmunaigas. |
26-06-2026 |
| 554. |
Turkey |
23-06-2026 |
The Work Will Be Done Without Any Issues. |
13-07-2026 |
| 555. |
Russian federation |
23-06-2026 |
Carrying Out Repair And Maintenance Work On The Equipment Of Advertising Light Inserts And Price Placards, Elements And Lightboxes On Buildings, Ministerial Displays At Llc Facilities... |
02-07-2026 |
| 556. |
Kazakhstan |
23-06-2026 |
Comprehensive Non-departmental Examination Of Design And Documentation "construction Of A Double-circuit Overhead Line 220 Kv Rp 220 Kv Altai - Ps 220 Kv Titan (tmk)" |
30-06-2026 |
| 557. |
Turkey |
23-06-2026 |
The Picnic Area Construction And Landscaping Work Will Be Tendered. |
16-07-2026 |
| 558. |
Turkey |
23-06-2026 |
Sewer-drinking Water-rainwater Work Will Be Carried Out. |
13-07-2026 |
| 559. |
Turkey |
23-06-2026 |
Sewer-drinking Water-rainwater Work Will Be Carried Out. |
06-07-2026 |
| 560. |
Turkey |
23-06-2026 |
The Construction Work Will Be Tendered. |
07-07-2026 |
| 561. |
Turkey |
23-06-2026 |
Bolluca Migration Mosque Construction Work |
09-07-2026 |
| 562. |
Turkey |
23-06-2026 |
Nigde Ulukisla Rooster (tomb) Water Irrigation Facility Construction Work |
08-07-2026 |
| 563. |
Turkey |
23-06-2026 |
Football Field, Field Lighting, Construction Works Of Stands And Changing Rooms |
13-07-2026 |
| 564. |
Turkey |
23-06-2026 |
Industrial Facility Works Will Be Carried Out. |
30-06-2026 |
| 565. |
Turkey |
23-06-2026 |
A Retaining Wall Will Be Built. |
30-06-2026 |
| 566. |
Turkey |
23-06-2026 |
Heating System Will Be Installed. |
07-07-2026 |
| 567. |
Kazakhstan |
23-06-2026 |
Installation And Welding Work To Eliminate Defects In The Heating System According To The Technical Specification |
24-06-2026 |
| 568. |
Turkey |
23-06-2026 |
Concrete Road Maintenance And Repair Work Will Be Carried Out. |
02-07-2026 |
| 569. |
Kazakhstan |
23-06-2026 |
Flushing And Pressure Testing Of The Heating System In Sports Complexes: Pavlodar Region, Village Of Zarya, Village Of Efremovka, Village Of Novoyamysh???, Village Of Olginka |
25-06-2026 |
| 570. |
Turkey |
23-06-2026 |
Maintenance, Repair, And Fire Renovation Works Will Be Carried Out. |
09-07-2026 |
|
Page Size
|
prev
Next
|