|
Country |
Date |
Summary |
Deadline |
| 231. |
Russian federation |
08-06-2026 |
The Right To Enter Into An Agreement For The Provision Of Services For Maintenance And Repair Of Welding Equipment For Ft-07-20-22 |
16-06-2026 |
| 232. |
Russian federation |
08-06-2026 |
The Right To Conclude An Agreement To Perform Work On Changing Wooden Sleepers On Non-public Railway Tracks |
09-06-2026 |
| 233. |
Russian federation |
08-06-2026 |
The Right To Enter Into An Agreement To Carry Out Repair Work On Rooms 415, 415a, 415b Of A Non-residential Building Inv. No. 4, 44 (building No. 01) With Installation Of A Split Air Conditioning System |
10-06-2026 |
| 234. |
Latvia |
08-06-2026 |
Construction Works For The Expansion Of Car Parking Lots At Ausekla Prospekt 15 And Vidus Prospekt 16a, Ogre |
25-06-2026 |
| 235. |
Russian federation |
08-06-2026 |
The Right To Enter Into An Agreement To Carry Out Construction, Installation And Commissioning Work On The Project expansion Of Extraction Capacities For Hafnium Production. Stage 3. Solution Mixing Section" |
10-06-2026 |
| 236. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 237. |
Kazakhstan |
08-06-2026 |
Materials For Repair Work |
10-06-2026 |
| 238. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 239. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 240. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
09-06-2026 |
| 241. |
Turkey |
08-06-2026 |
Plumbing Works Will Be Done |
15-06-2026 |
| 242. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 243. |
Turkey |
08-06-2026 |
Drinking Water Will Be Taken. |
22-06-2026 |
| 244. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 245. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
09-06-2026 |
| 246. |
Kazakhstan |
08-06-2026 |
Work On The Production Of Road Signs |
10-06-2026 |
| 247. |
Kazakhstan |
08-06-2026 |
Water Well Drilling Work |
10-06-2026 |
| 248. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System. |
09-06-2026 |
| 249. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
09-06-2026 |
| 250. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
09-06-2026 |
| 251. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 252. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 253. |
Kazakhstan |
08-06-2026 |
Services For Flushing And Pressure Testing Of The Heating System |
10-06-2026 |
| 254. |
Russian federation |
08-06-2026 |
Drinking Water Supply (19l) |
09-06-2026 |
| 255. |
Latvia |
08-06-2026 |
State Significance Drainage Ditch, Melioration Cadastre Code 38474 |
02-07-2026 |
| 256. |
Uzbekistan |
08-06-2026 |
Rfp: Climate Resilient Water, Sanitation And Hygiene (wash) Package Development For School Children (1-4 And 5-11 Std) And Training Of Selected Master Trainers For Capacity Building Roll Out With Teachers |
18-06-2026 |
| 257. |
Russian federation |
08-06-2026 |
Carrying Out Work On Flushing And Hydraulic Testing Of The Heating System In The Building At The Address: 187000, Leningrad Region, Tosno, St. Boyarova, 31a. |
10-06-2026 |
| 258. |
Russian federation |
08-06-2026 |
Providing Maintenance And Routine Repair Services For The Automatic Barrier Gama 600 |
15-06-2026 |
| 259. |
Russian federation |
08-06-2026 |
Replacement Of Flooring In Classrooms On The First Floor No. 1, No. 2, No. 4, No. 6/1, No. 7/1 (270 Sq. M.), In An Institution Located At 18 1st Sovetsky Ave., Otradnoye, Kirovsky District, Leningrad Region. |
08-06-2026 |
| 260. |
Russian federation |
08-06-2026 |
Services For The Implementation Of Construction Quality Control And Laboratory Support At The Facility: "repair Of A Section Of The Highway In The Village Of Yurki (entrance To The Dnp "malinovka-1", Snt "yurki") |
08-06-2026 |
| 261. |
Russian federation |
08-06-2026 |
Work On Replacing Sewer Outlets D110mm, L-5.5mm, From The Inside Of The Basement Wall To The Sewer Well With Installation Connection To The House Drainage System Using The Trenchless Method |
08-06-2026 |
| 262. |
Russian federation |
08-06-2026 |
Provision Of Maintenance Services For Street Lighting Facilities On The Territory Of The Municipal Municipality "ivangorod Urban Settlement" |
09-06-2026 |
| 263. |
Russian federation |
08-06-2026 |
Installation Of Street Lighting In The Village. Alekhovshchina |
09-06-2026 |
| 264. |
Russian federation |
08-06-2026 |
Heat And Power Controller |
11-06-2026 |
| 265. |
Russian federation |
08-06-2026 |
Training Of Employees According To Programs No. "safe Operation Of Electrical Installations" |
08-06-2026 |
| 266. |
Russian federation |
08-06-2026 |
Provision Of Maintenance Services For Three Sewage Pumping Stations (sps) Located On Land Plots With Cadastral Numbers: 47:14:0605002:1 Household. Household Water Pumping Station, 47:14:0605002:4 Storm Water Pumping Station, 47:14:0605002:4 Household Pump |
09-06-2026 |
| 267. |
Russian federation |
08-06-2026 |
The Right To Enter Into An Agreement For The Supply Of A Set Of Equipment For The Construction (reconstruction) Of A Pipeline Network For Heat Supply Of The Osp Rotational Camp drilling Site No. 3 |
10-06-2026 |
| 268. |
Russian federation |
08-06-2026 |
Supply Of Spare Parts For Street Lighting Repairs |
11-06-2026 |
| 269. |
Russian federation |
08-06-2026 |
Current Repairs Of Toilet And Bathroom |
11-06-2026 |
| 270. |
Russian federation |
08-06-2026 |
Repair Of Furnaces P-101, P-201 During The Period Of Major Repairs Of Unit 22-4 Of The Branch Of Pjsc Ank Bashneft Bashneft-novoil |
15-06-2026 |
|
Page Size
|
prev
Next
|