Loading..

11921 Active Tenders For CIS Region

 

Tenders From Infrastructure And Construction

Loading Data Please Wait...
Total No Of Tenders - 5799
Country Date Summary Deadline
1561. Kyrgyzstan 03-06-2026 Continuation And Completion Of The Wrestling Hall Facility S.tasma Karasaev Jsc 08-06-2026
1562. Kyrgyzstan 03-06-2026 Repair Of The Main Room And The Stage Of The A. Tentiev Cultural House Of Baysak Village. 17-06-2026
1563. Kyrgyzstan 03-06-2026 Design Of A Mini Football Field On The Territory Of A Secondary School Named After B. Erkinbaeva In The Village Of Tegerek-saz A/a R. Abdikadirov, Kara-kulzha District, Osh Region 16-06-2026
1564. Kyrgyzstan 03-06-2026 Repair Of Hockey Area In The Village Of Baizak 15-06-2026
1565. Kyrgyzstan 03-06-2026 Purchase Of Construction Materials For Routine Repairs Of The Building 08-06-2026
1566. Kyrgyzstan 03-06-2026 Capital Renovation Of The Building Of "karlygach-kandy Pre-school Education Institution" In Yoush Village Of Bel Village Government. 16-06-2026
1567. Kyrgyzstan 03-06-2026 Street Lighting Device For Chikebaev And Zooshev Street In The Village Of Bash-kuugandy 19-06-2026
1568. Kyrgyzstan 03-06-2026 Current Painting Of The Exterior Of A 2 (two) Story House Located In Samarkandek A/o Center 08-06-2026
1569. Kyrgyzstan 03-06-2026 Renovation Of Additional Sewerage, Water Tanks For Fire Fighters, And Water-falling Septics Of The Pre-school "raykhan" School Named As Srajdinova Kazada Aji Ene. 16-06-2026
1570. Estonia 03-06-2026 Construction Works Of The Vanasadama 110/10 Kv Substation Building 16-07-2026
1571. Kazakhstan 03-06-2026 Request For Quotations No. 2086875 add To Favorites carrying Out Work On The Design Of The Construction Site construction Of The Precursor Warehouse Building Of The Assay And Analytical Laboratory, Located At The Address: Pavlodar Region, Bayanaul Distr 09-06-2026
1572. Kazakhstan 03-06-2026 Request For Proposals No. 2086877 add To Favorites designing An Extension On The Technical Floor 08-06-2026
1573. Turkey 03-06-2026 Environmental Landscaping Will Be Done 15-06-2026
1574. Turkey 03-06-2026 Flood Protection Works Will Be Carried Out 18-06-2026
1575. Turkey 03-06-2026 Building Works Will Be Done 17-06-2026
1576. Turkey 03-06-2026 Maintenance And Repair Works Will Be Carried Out 18-06-2026
1577. Turkey 03-06-2026 Plumbing Works Will Be Done 09-06-2026
1578. Turkey 03-06-2026 Building Works Will Be Done 19-06-2026
1579. Turkey 03-06-2026 Building Works Will Be Done 10-06-2026
1580. Turkey 03-06-2026 The Building Will Be Renovated 09-06-2026
1581. Turkey 03-06-2026 Additional Building Will Be Built 09-06-2026
1582. Turkey 03-06-2026 Landscaping Works Will Be Done 17-06-2026
1583. Turkey 03-06-2026 Maintenance And Repair Works Will Be Carried Out 09-06-2026
1584. Turkey 03-06-2026 Primary School Repair Work Will Be Carried Out 10-06-2026
1585. Turkey 03-06-2026 Building Construction And Landscaping Will Be Carried Out 23-06-2026
1586. Turkey 03-06-2026 Astroturf Field Will Be Built 12-06-2026
1587. Turkey 03-06-2026 Building Works Will Be Done 15-06-2026
1588. Turkey 03-06-2026 Drinking Water Construction Will Be Completed 16-06-2026
1589. Turkey 03-06-2026 Building Repair Work Will Be Carried Out 17-06-2026
1590. Turkey 03-06-2026 Building Repair Works Will Be Carried Out 17-06-2026
1591. Turkey 03-06-2026 Natural Gas Conversion Will Be Carried Out 16-06-2026
1592. Turkey 03-06-2026 Renovation Works Will Be Carried Out 18-06-2026
1593. Turkey 03-06-2026 Building Repair Work Will Be Carried Out 16-06-2026
1594. Turkey 03-06-2026 Natural Gas Conversion Work Will Be Carried Out 18-06-2026
1595. Turkey 03-06-2026 Repair Work Will Be Done 10-06-2026
1596. Turkey 03-06-2026 Building Repair Works Will Be Carried Out 16-06-2026
1597. Turkey 03-06-2026 Flood And Drying Facilities Will Be Repaired. 22-06-2026
1598. Turkey 03-06-2026 Natural Gas Conversion Work Will Be Carried Out 09-06-2026
1599. Turkey 03-06-2026 Landscaping Construction Will Be Carried Out 18-06-2026
1600. Turkey 03-06-2026 Maintenance And Repair Works Will Be Carried Out 16-06-2026
Page Size prev        Next