|
Country |
Date |
Summary |
Deadline |
| 621. |
Kazakhstan |
18-06-2026 |
Heating System Flushing |
22-06-2026 |
| 622. |
Kazakhstan |
18-06-2026 |
Brush With A Front Hopper Shp-156, Hydraulic Road Brush |
19-06-2026 |
| 623. |
Afghanistan |
18-06-2026 |
Construction Of (hybrid Modality) Protection Wall, Check Dam And Super Passage - Ghazni Province |
09-07-2026 |
| 624. |
Afghanistan |
18-06-2026 |
Request For Rehabilitation Of Taligak High School (ohw- Itb-ohw-blk-itb-26-02) |
27-06-2026 |
| 625. |
Kazakhstan |
18-06-2026 |
Paint (ods 40-3529) |
25-06-2026 |
| 626. |
Afghanistan |
18-06-2026 |
The Project Of Purchase Of Equipment And Activation Of The Secada Substation System In Geza Gil And Purchase Of Equipment And Activation Of The System |
02-07-2026 |
| 627. |
Turkey |
18-06-2026 |
Plumbing Work Will Be Done. |
01-07-2026 |
| 628. |
Lithuania |
18-06-2026 |
Reconstruction Of Heat Supply Networks In The Town Of Skaidiškes (quarter Renovation) |
24-06-2026 |
| 629. |
Kazakhstan |
18-06-2026 |
Current Heating Repair Of The Administrative Building |
19-06-2026 |
| 630. |
Afghanistan |
18-06-2026 |
Construction Services For Boundary Wall And Guard Room Of Cold Storages |
29-06-2026 |
| 631. |
Russian federation |
18-06-2026 |
Carrying Out Work On The Repair Of Bathrooms And Shower Rooms At The Address: St. Petersburg, 10th Sovetskaya St., 23, Lit. N |
26-06-2026 |
| 632. |
Pakistan |
18-06-2026 |
Renovation Tabba Washroom 2nd Phase Iba Main Campus |
08-07-2026 |
| 633. |
Afghanistan |
18-06-2026 |
Supply Of Medonic Analyzer Diluent (rfid) And Medonic Analyzer Lyse For Bamyan Hospital; Renovation Works At Dasht-e-safed Bhc, Bayani Bhc, And Shah Foladi Chc, Bamyan Province. Medonic Analyzer Diluent (rfid), Medonic Analyzer Lyse |
23-06-2026 |
| 634. |
Kazakhstan |
18-06-2026 |
Cable Pipe 4 X 16 |
19-06-2026 |
| 635. |
Afghanistan |
18-06-2026 |
Construction Of Wash Intervention In Charshanghu At Dawlat Abad – Faryab Province |
01-07-2026 |
| 636. |
Turkey |
18-06-2026 |
The Construction Will Be Carried Out. |
09-07-2026 |
| 637. |
Kazakhstan |
18-06-2026 |
Current Repair Of The Building Of The Temporary Detention Facility In The Zhanaarkinsky District |
23-06-2026 |
| 638. |
Turkey |
18-06-2026 |
The Work Of Renovation And Repair Will Be Tendered. |
26-06-2026 |
| 639. |
Turkey |
18-06-2026 |
The Renovation Will Be Carried Out. |
26-06-2026 |
| 640. |
Turkey |
18-06-2026 |
The Work Of Renovation And Repair Will Be Tendered. |
07-07-2026 |
| 641. |
Kazakhstan |
18-06-2026 |
Services For The Maintenance Of Electrical, Electrical Distribution/regulating Equipment And Similar Apparatus / Maintenance Of Street Lighting (replacement Of Lamps) In The Rural District Of Altyn Dan |
22-06-2026 |
| 642. |
Kazakhstan |
18-06-2026 |
Pipe St. 12x18n10t F 51x3mm |
23-06-2026 |
| 643. |
Afghanistan |
18-06-2026 |
Package # 28 – Af2 Wsm: Construction Of 2 Check Dams Of 1. Chatqa Sai In Dahna-e-ghori, And 2. Tahiryan In The Baghlan Markazi District Of Baghlan Province, Northeast/kunduz Regional Office Of Afghanistan.
open In A New Window |
01-07-2026 |
| 644. |
Turkey |
18-06-2026 |
Intersection Arrangement Work Will Be Carried Out |
09-07-2026 |
| 645. |
Kazakhstan |
18-06-2026 |
Services For Preventive Testing Of Electrical Equipment And Grounding Devices |
22-06-2026 |
| 646. |
Turkey |
18-06-2026 |
Repair Work Will Be Carried Out At The Public Education Centers. |
26-06-2026 |
| 647. |
Turkey |
18-06-2026 |
Installation Work Will Be Carried Out. |
13-07-2026 |
| 648. |
Kazakhstan |
18-06-2026 |
Work On The Installation Of Autonomous Sewage |
19-06-2026 |
| 649. |
Kazakhstan |
18-06-2026 |
Pvc Drainage Pipe, Diameter 51-100 Mm Steel Water And Gas Pipe, Diameter 100.1-150 Mm T General Purpose Polyethylene Pipe, Diameter 101-150 Mm |
24-06-2026 |
| 650. |
Kazakhstan |
18-06-2026 |
Acquisition Of Street Concrete Planters |
22-06-2026 |
|
Page Size
|
prev
Next
|