|
Country |
Date |
Summary |
Deadline |
| 411. |
Kazakhstan |
24-06-2026 |
Current Repair Of The 3rd Floor Of The Student House Building No. 4. |
09-07-2026 |
| 412. |
Kazakhstan |
24-06-2026 |
Construction Of A Water Supply System In The Village Of Akdala, Balkhash District |
25-06-2026 |
| 413. |
Kazakhstan |
24-06-2026 |
Current Repair Of The Fence Of The Sports Ground In The Village Of Mortyk, Kokterek Rural District, Ualikhano District, Sko. |
25-06-2026 |
| 414. |
Kazakhstan |
24-06-2026 |
Work On The Improvement Of The Park (according To The Technical Specifications) |
26-06-2026 |
| 415. |
Kazakhstan |
24-06-2026 |
Services For The Maintenance Of Gas Installations/equipment/systems/apparatuses/gas Pipelines. Services Of Vdg |
25-06-2026 |
| 416. |
Kazakhstan |
24-06-2026 |
Government Procurement Of Construction Materials For The Ust-kamenogorsk Branch |
26-06-2026 |
| 417. |
Kazakhstan |
24-06-2026 |
Service For The Development Of A Scientifically Justified Dendrological Plan And The Design Of Digital Schemes (maps) For The Landscaping Of Settlements In The Shardara District |
26-06-2026 |
| 418. |
Kazakhstan |
24-06-2026 |
Maintenance Of Intra-settlement Roads In The Summer Period |
25-06-2026 |
| 419. |
Kazakhstan |
24-06-2026 |
Acquisition Of A Spare Part For The School Bus Uaz-220695-460 Mikhailovskaya Secondary School |
25-06-2026 |
| 420. |
Kazakhstan |
24-06-2026 |
Work On Installing A Plastic Door (read The Terms Carefully!!!) |
26-06-2026 |
| 421. |
Kazakhstan |
24-06-2026 |
Current Repair Work Inside And Outside The Kindergarten, Within The Enclosure |
25-06-2026 |
| 422. |
Kazakhstan |
24-06-2026 |
Painting And Whitewashing Of The Foyer, Vestibule, Dining Room, Corridor (according To The Technical Specification) |
25-06-2026 |
| 423. |
Kazakhstan |
24-06-2026 |
Services For The Maintenance Of Supply And Exhaust Ventilation Systems At The Aksai Branch Of Rgp Iyaf |
25-06-2026 |
| 424. |
Kazakhstan |
24-06-2026 |
Toilet Seat Lid. |
26-06-2026 |
| 425. |
Kazakhstan |
24-06-2026 |
State Procurement Of A Frameless Sofa (business School) |
25-06-2026 |
| 426. |
Kazakhstan |
24-06-2026 |
The Acquisition Of A Cattle Burial Site In The Village Of Kalam-karasu Of The Zhangeldy District Of The Kostanay Region |
25-06-2026 |
| 427. |
Kazakhstan |
24-06-2026 |
Goods For The Current Repair Of The Kindergarten |
25-06-2026 |
| 428. |
Kazakhstan |
24-06-2026 |
Development Of A Psd For The Gasification Of The Administrative Building Of The Population Service Center Of The Uyghur District Of Almaty Region With The Conduct Of State Expertise |
25-06-2026 |
| 429. |
Russian federation |
24-06-2026 |
Supply Of Concrete To Deposits |
29-06-2026 |
| 430. |
Kazakhstan |
24-06-2026 |
Work On The Repair Of The Water Distiller |
25-06-2026 |
| 431. |
Russian federation |
24-06-2026 |
Tng-26-smr-nz-5 Execution Of Works And Services For The Project: oil Pipeline Of The Central Pumping Station Of The Russian Oilfield - Psp Zapolyarnoye. Vosk-t System Oil Pipeline Tsps Russkoe Field - Psp Fill... |
06-07-2026 |
| 432. |
Russian federation |
24-06-2026 |
135454. Steaming Devices. Llc Komsomolsk Oil Refinery. |
26-06-2026 |
| 433. |
Kazakhstan |
24-06-2026 |
Current Repair Of The Collegeexternal Sewage System |
01-07-2026 |
| 434. |
Kazakhstan |
24-06-2026 |
Current Repair Of The Premises Of The Educational Building...3 Floors, Corridors |
25-06-2026 |
| 435. |
Kazakhstan |
24-06-2026 |
Work On The Production Of Plates (duis) |
25-06-2026 |
| 436. |
Kazakhstan |
24-06-2026 |
Work On Performing Horizontal Drilling Under The Asphalt Road |
25-06-2026 |
| 437. |
Kazakhstan |
24-06-2026 |
Services For Flushing And Pressure Testing Of External Heating Networks |
26-06-2026 |
| 438. |
Kazakhstan |
24-06-2026 |
Acquisition Of Monoblocks For The Kgu Center For Social Adaptation Pana |
25-06-2026 |
| 439. |
Kazakhstan |
24-06-2026 |
Development Of A Psd For The Object: Construction Of A Livestock Burial Site In The Village Of Akbastau, Abai District, (attachment) |
25-06-2026 |
| 440. |
Kazakhstan |
24-06-2026 |
Services For Expert Examination Of The Technical Condition Of The Main And Auxiliary Equipment Of Boiler Houses (5 Units), As Well As Readiness To Ensure The Supply Of Thermal Energy To Consumers In Accordance With The Approved Schedules In The Autumn-win |
25-06-2026 |
|
Page Size
|
prev
Next
|