|
Country |
Date |
Summary |
Deadline |
| 951. |
Kazakhstan |
19-06-2026 |
Acquisition Of A 3-room House In The City Of Taldykorgan |
26-06-2026 |
| 952. |
Kyrgyzstan |
19-06-2026 |
Reconstruction Of School No. 89 Named After. Abdrakhmanova, Pravda Village, Kara-suu District, Osh Region. |
08-07-2026 |
| 953. |
Russian federation |
19-06-2026 |
providing Services For Coating Parts Of Pipelines. |
02-07-2026 |
| 954. |
Moldova republic of |
19-06-2026 |
What |
01-07-2026 |
| 955. |
Moldova republic of |
19-06-2026 |
Repair Of The Workshop Room In The Premises Of Ip Gimnaziul S. Tiganca |
01-09-2026 |
| 956. |
Kyrgyzstan |
19-06-2026 |
Reconstruction Of Krasnorechinskaya School, Issyk-ata District, Chui Region, Krasnaya Rechka Village |
08-07-2026 |
| 957. |
Kazakhstan |
19-06-2026 |
Work On The Improvement Of Tourist Facilities |
25-06-2026 |
| 958. |
Russian federation |
19-06-2026 |
Pipe-in-pipe Heating System |
25-06-2026 |
| 959. |
Russian federation |
19-06-2026 |
Supply Of Perimeter Fencing Elements For The Needs Of The Yenisei Oil Depot Of The Northern Branch Of Jsc Knp |
25-06-2026 |
| 960. |
Kazakhstan |
19-06-2026 |
Supply Of Telecommunications Equipment To The Main Bank Building |
29-06-2026 |
| 961. |
Moldova republic of |
19-06-2026 |
Wastewater Evacuation Works |
01-07-2026 |
| 962. |
Russian federation |
19-06-2026 |
Notice About An Open Request For Proposals For The Right To Conclude A Framework Agreement To Carry Out Repair And Restoration Work At The Indoor Facilities Of The Existing Cellular Communication Network Of Mts Pjsc In The Moscow Region In 2026-2028. (ten |
02-07-2026 |
| 963. |
Russian federation |
19-06-2026 |
performance Of Construction And Installation Work On The Project technical Re-equipment Of The Ulyanovsk Oil Depot, Replacement Of Fire Tanks |
26-06-2026 |
| 964. |
Turkey |
19-06-2026 |
Maintenance And Renovation Work Will Be Carried Out On The Buildings. |
07-07-2026 |
| 965. |
Kazakhstan |
19-06-2026 |
Work On The Current Repair Of Streets In The Village Of Narynkol In The Rayymbek District Of Almaty Region |
29-06-2026 |
| 966. |
Turkey |
19-06-2026 |
The Construction Of The Drinking Water Transfer And Discharge Line Will Be Tendered. |
10-07-2026 |
| 967. |
Russian federation |
19-06-2026 |
Carrying Out A Complex Of Electrical Installation, Low-current Works Including The Appp System During The Construction Of The Facility: Apartment Building (houses) With Built-in And Attached Premises, Garages (parking Lots), Primary And Secondary General |
25-06-2026 |
| 968. |
Turkey |
19-06-2026 |
Karabük Safranbolu Fatih Sultan Mehmet Science High School Repair Work Tender |
02-07-2026 |
| 969. |
Turkey |
19-06-2026 |
The Work Will Be Done. |
06-07-2026 |
| 970. |
Turkey |
19-06-2026 |
The Repair And Maintenance Of The Retaining Structures Will Be Carried Out. |
02-07-2026 |
| 971. |
Russian federation |
19-06-2026 |
Providing Services For The Inspection Of Building Structures And Utility Networks Of Buildings In Order To Determine The Percentage Of Deterioration Of The Building And The Possibility Of Further Operation... |
26-06-2026 |
| 972. |
Kazakhstan |
19-06-2026 |
Acquisition Of A 3-room House In The City Of Taldykorgan |
26-06-2026 |
| 973. |
Russian federation |
19-06-2026 |
Performing A Complex Of Electrical Installation, Low-current Works Including The Appp System During The Construction Of The Facility: Apartment Building (houses) With Built-in Premises, Garages (parking Lots), Preschool Education Facility, Primary And Sec |
25-06-2026 |
| 974. |
Turkey |
19-06-2026 |
A Work Cabin Will Be Constructed. |
22-07-2026 |
| 975. |
Russian federation |
19-06-2026 |
Pipeline Connecting Parts According To Specifications (including Requirements According To Mu.01.27 Rev.3) |
25-06-2026 |
| 976. |
Afghanistan |
18-06-2026 |
The Construction Project Of The Wall Surrounding The Headquarters Substation. |
05-07-2026 |
| 977. |
Russian federation |
18-06-2026 |
Repair Of Sectional Doors Block D And Block B |
29-06-2026 |
| 978. |
Afghanistan |
18-06-2026 |
Design Survey Project, Procurement Of Installation Equipment, Testing And Commissioning Of 110 Kv Transmission Line Project From Ashqlan Substation To Kunduz Central Substation With A Length Of 9.3 Km |
01-07-2026 |
| 979. |
Russian federation |
18-06-2026 |
Carrying Out Work On Applying Road Markings On Local Roads Under The Jurisdiction Of The Cherepovets Municipal District Of The Vologda... |
25-06-2026 |
| 980. |
Turkey |
18-06-2026 |
The Work Will Be Done. |
25-06-2026 |
|
Page Size
|
prev
Next
|