|
Country |
Date |
Summary |
Deadline |
| 2061. |
Turkey |
23-06-2026 |
The Construction Of Single-layer Coated Surface Pavement Works On Neighborhood Roads. |
13-07-2026 |
| 2062. |
Turkey |
23-06-2026 |
Will Be Renovated |
30-06-2026 |
| 2063. |
Turkey |
23-06-2026 |
Repair Work Will Be Carried Out. |
01-07-2026 |
| 2064. |
Turkey |
23-06-2026 |
Landscaping Work Will Be Carried Out. |
30-06-2026 |
| 2065. |
Kazakhstan |
23-06-2026 |
Oil-based White Paint For Painting Work Outside The Kindergarten |
24-06-2026 |
| 2066. |
Turkey |
23-06-2026 |
The Work Of Establishing A Climate System Will Be Carried Out. |
29-06-2026 |
| 2067. |
Kazakhstan |
23-06-2026 |
Service For Flushing And Pressure Testing Of The Heating System |
24-06-2026 |
| 2068. |
Kazakhstan |
23-06-2026 |
Repair Work On Electrolysis Polypropylene Baths |
29-06-2026 |
| 2069. |
Turkey |
23-06-2026 |
The Work Will Be Done Without Any Issues. |
14-07-2026 |
| 2070. |
Kazakhstan |
23-06-2026 |
Services For Conducting Aerodynamic Tests Of Ventilation Systems Of Objects In Aktau, Zhetybaymunaigas And Kalamkasmunaigas. |
26-06-2026 |
| 2071. |
Turkey |
23-06-2026 |
The Work Will Be Done Without Any Issues. |
13-07-2026 |
| 2072. |
Russian federation |
23-06-2026 |
Carrying Out Repair And Maintenance Work On The Equipment Of Advertising Light Inserts And Price Placards, Elements And Lightboxes On Buildings, Ministerial Displays At Llc Facilities... |
02-07-2026 |
| 2073. |
Kazakhstan |
23-06-2026 |
Comprehensive Non-departmental Examination Of Design And Documentation "construction Of A Double-circuit Overhead Line 220 Kv Rp 220 Kv Altai - Ps 220 Kv Titan (tmk)" |
30-06-2026 |
| 2074. |
Turkey |
23-06-2026 |
The Picnic Area Construction And Landscaping Work Will Be Tendered. |
16-07-2026 |
| 2075. |
Turkey |
23-06-2026 |
Sewer-drinking Water-rainwater Work Will Be Carried Out. |
13-07-2026 |
| 2076. |
Turkey |
23-06-2026 |
Sewer-drinking Water-rainwater Work Will Be Carried Out. |
06-07-2026 |
| 2077. |
Turkey |
23-06-2026 |
The Construction Work Will Be Tendered. |
07-07-2026 |
| 2078. |
Turkey |
23-06-2026 |
Bolluca Migration Mosque Construction Work |
09-07-2026 |
| 2079. |
Turkey |
23-06-2026 |
Nigde Ulukisla Rooster (tomb) Water Irrigation Facility Construction Work |
08-07-2026 |
| 2080. |
Turkey |
23-06-2026 |
Football Field, Field Lighting, Construction Works Of Stands And Changing Rooms |
13-07-2026 |
| 2081. |
Turkey |
23-06-2026 |
Industrial Facility Works Will Be Carried Out. |
30-06-2026 |
| 2082. |
Turkey |
23-06-2026 |
A Retaining Wall Will Be Built. |
30-06-2026 |
| 2083. |
Turkey |
23-06-2026 |
Heating System Will Be Installed. |
07-07-2026 |
| 2084. |
Kazakhstan |
23-06-2026 |
Installation And Welding Work To Eliminate Defects In The Heating System According To The Technical Specification |
24-06-2026 |
| 2085. |
Turkey |
23-06-2026 |
Concrete Road Maintenance And Repair Work Will Be Carried Out. |
02-07-2026 |
| 2086. |
Kazakhstan |
23-06-2026 |
Flushing And Pressure Testing Of The Heating System In Sports Complexes: Pavlodar Region, Village Of Zarya, Village Of Efremovka, Village Of Novoyamysh???, Village Of Olginka |
25-06-2026 |
| 2087. |
Turkey |
23-06-2026 |
Maintenance, Repair, And Fire Renovation Works Will Be Carried Out. |
09-07-2026 |
| 2088. |
Turkey |
23-06-2026 |
The Work Will Be Done Without Any Issues. |
17-07-2026 |
| 2089. |
Turkey |
23-06-2026 |
Plumbing And Wet Floor Repairs Will Be Carried Out. |
30-06-2026 |
| 2090. |
Kazakhstan |
23-06-2026 |
Comprehensive Non-departmental Examination Of The Design And Documentation "construction Of The Entry And Exit Of The 220 Kv Overhead Line L-2014 Bges - No. 7 (right Circuit) At The 220 Kv Tmk Substation" |
30-06-2026 |
|
Page Size
|
prev
Next
|