|
Country |
Date |
Summary |
Deadline |
| 31. |
Pakistan |
19-06-2026 |
Supply Of Row Material As Required By Sui Northern Gas Pipelines Limited. Row Material |
07-07-2026 |
| 32. |
Kazakhstan |
19-06-2026 |
Acquisition Of Paving Slabs |
22-06-2026 |
| 33. |
Kazakhstan |
19-06-2026 |
Acquisition, Delivery, And Installation Of Small Architectural Forms (saf) For Landscaping The Area |
23-06-2026 |
| 34. |
Kazakhstan |
19-06-2026 |
Acquisition Of A Manual Garden Construction Cart |
22-06-2026 |
| 35. |
Kazakhstan |
19-06-2026 |
Work On The Current Repair Of Non-residential Buildings/structures/premises |
22-06-2026 |
| 36. |
Georgia |
19-06-2026 |
Procurement Of Various Materials For The Villages Within The Framework Of The Village Program In The City Hall Of Baghdati Municipality.
|
29-06-2026 |
| 37. |
Georgia |
19-06-2026 |
Procurement Of Bridge Construction Works On The Ajaristskal River In The Village Of Godgadze, Provided For In The Framework Of The Capital Transfer By The Republican Budget Of The Autonomous Republic Of Adjara
|
08-07-2026 |
| 38. |
Kazakhstan |
19-06-2026 |
Work On The Production Of Blinds |
22-06-2026 |
| 39. |
Kazakhstan |
19-06-2026 |
Goods For The E. Dalenov Research Institute |
22-06-2026 |
| 40. |
Kazakhstan |
19-06-2026 |
Current Repair Of The School Cafeteria |
22-06-2026 |
| 41. |
Kazakhstan |
19-06-2026 |
Service For Assessing The Technical Condition Of Electrical Goods With The Issuance Of Technical Conclusion Reports |
22-06-2026 |
| 42. |
Georgia |
19-06-2026 |
"procurement Of Various Materials Needed For Arranging Outdoor Lighting For Villages Within The Framework Of The Rural Program In Baghdati Municipality"
|
29-06-2026 |
| 43. |
Georgia |
19-06-2026 |
Within The Framework Of The Rural Support Program: 1. Arrangement Of Outdoor Lighting In The Village Of Alastan - 48,000 Gel (16,000 Gel From The Rural Support Program, 32,000 Gel From The Local Budget). 2. Arrangement Of Outdoor Lighting In The Village O |
29-06-2026 |
| 44. |
Kazakhstan |
19-06-2026 |
Purchasing Goods Necessary For Repair Work |
22-06-2026 |
| 45. |
Georgia |
19-06-2026 |
Within The Framework Of The Rural Support Program: 1. Arrangement Of Outdoor Lighting In The Village Of Chunchka - 36,000 Gel (12,000 Gel From The Rural Support Program, 24,000 From The Local Budget). 2. Arrangement Of Outdoor Lighting In Khorenia Village |
29-06-2026 |
| 46. |
Georgia |
19-06-2026 |
Procurement Of Concrete Within The Framework Of The Rural Program And Local Budget.
|
29-06-2026 |
| 47. |
Kazakhstan |
19-06-2026 |
Improvement Of The Territory Of The Cultural House Located At The Address: Sko, Gabit Musrepov District, Novoishimskoe Village, Abilay Khan Street, 19 |
22-06-2026 |
| 48. |
Georgia |
19-06-2026 |
Within The Framework Of The Rural Support Program: 1. Arrangement Of Outdoor Lighting In The Village Of Alathumani - 47,828 Gel (16,000 Gel From The Rural Support Program, 31,828 Gel From The Local Budget). 2. Arrangement Of Outdoor Lighting In The Villag |
29-06-2026 |
| 49. |
Georgia |
19-06-2026 |
Village In Dzegvi, Restoration Works Of The Road Infrastructure Damaged By Natural Disasters
|
29-06-2026 |
| 50. |
Georgia |
19-06-2026 |
Within The Framework Of The Rural Support Program: 1. Arrangement Of Outdoor Lighting In The Village Of Kochio - 47,992 Gel (16,000 Gel From The Rural Support Program, 31,992 Gel From The Local Budget). 2. Arrangement Of Outdoor Lighting In The Village Of |
29-06-2026 |
| 51. |
Georgia |
19-06-2026 |
Within The Framework Of The Rural Support Program: 1. Arrangement Of Outdoor Lighting In The Village Of Kartikami - 59,868 Gel (20,000 Gel From The Rural Support Program, 39,868 Gel From The Local Budget). 2. Arrangement Of Outdoor Lighting In The Village |
29-06-2026 |
| 52. |
Georgia |
19-06-2026 |
Village Restoration Works Of Damaged Infrastructure In Navdaraantkar (arrangement Of Gabions).
|
29-06-2026 |
| 53. |
Georgia |
19-06-2026 |
In Order To Carry Out Liquidation Measures For The Consequences Of The Disaster, St. Purchase Of Construction Works Of Reinforced Concrete Drainage Channel On Mechanization Street (behind Vakhtang Kvirkvelias House) In Tsalenjikha
|
29-06-2026 |
| 54. |
Kazakhstan |
19-06-2026 |
Refrigerator Repair Work |
22-06-2026 |
| 55. |
Georgia |
19-06-2026 |
Sighnaghi Municipality Village. Square Arrangement Works In Bodbe
|
29-06-2026 |
| 56. |
Georgia |
19-06-2026 |
Village Works Of Rehabilitation Of The Asphalt Concrete Pavement Of The Internal District Road And Arrangement Of The Drainage Channel In Nakhnigora.
|
08-07-2026 |
| 57. |
Kazakhstan |
19-06-2026 |
Government Procurement Of Works |
26-06-2026 |
| 58. |
Kazakhstan |
19-06-2026 |
Work On The Installation (mounting) Of Water Metering Equipment/devices |
22-06-2026 |
| 59. |
Georgia |
19-06-2026 |
The Object Of The Purchase Is The Construction Of 3 Units Of Booths At The Checkpoints Of The Hiking Trails In The Operational Areas Of The Administration Of The Lagodekhi Protected Areas And The Administration Of The Borjom Kharagauli National Park.
|
01-07-2026 |
| 60. |
Kazakhstan |
19-06-2026 |
Current Repair Of The Heating System Of The Uk And Ubc Of The Gkp Aktobe Higher Polytechnic College At The Address: Aktobe Region, City Of Aktobe, Astana District, T. Ryskulov Street, 267 |
22-06-2026 |
| 61. |
Kazakhstan |
19-06-2026 |
General-purpose Capacitor, Permanent |
22-06-2026 |
| 62. |
Kazakhstan |
19-06-2026 |
Acquisition Of Goods Block-module Building For The Placement Of A Boiler Room According To The Technical Specifications Of The Customer |
22-06-2026 |
| 63. |
Kazakhstan |
19-06-2026 |
Installation Of Fire Alarm/extinguishing Systems For The No. 24 Secondary School Named After Ürmash Tüktibaev Of The Education Department Of The Kazaly District Of The Education Management Of The Kyzylorda Region. |
22-06-2026 |
| 64. |
Kazakhstan |
19-06-2026 |
Work On Removing Old Doors And Installing New Ones According To Technical Specifications |
22-06-2026 |
| 65. |
Kazakhstan |
19-06-2026 |
Work On The Dismantling And Laying Of Tiles. |
22-06-2026 |
| 66. |
Kazakhstan |
19-06-2026 |
Parts For The Oviv Pipeline |
26-06-2026 |
| 67. |
Kazakhstan |
19-06-2026 |
Tmc Pto North |
26-06-2026 |
| 68. |
Kazakhstan |
19-06-2026 |
St. Žanaarka Office |
26-06-2026 |
| 69. |
Russian federation |
19-06-2026 |
Provision Of Services For Checking Design And Estimate Documentation For The Following Objects: "laying Sewerage Networks In The Village Of Kalitino - Fap" |
22-06-2026 |
| 70. |
Russian federation |
19-06-2026 |
Provision Of Services For Checking Design And Estimate Documentation For The Following Objects: "laying Cold Water Supply Networks In The Village Of Kalitino - Fap" |
22-06-2026 |
| 71. |
Estonia |
19-06-2026 |
Renewal Of The Scada System Of The Viljandi Wastewater Treatment Plant |
09-07-2026 |
| 72. |
Kazakhstan |
19-06-2026 |
Public Procurement Of Works |
26-06-2026 |
| 73. |
Estonia |
19-06-2026 |
Kodijärve Home Family House Repairs |
14-07-2026 |
| 74. |
Kazakhstan |
19-06-2026 |
Water-dispersible Paint For Whitewashing Trees |
22-06-2026 |
| 75. |
Estonia |
19-06-2026 |
The 2nd Stage Of The Construction Of Heat Pipelines Is Underway |
17-07-2026 |
| 76. |
Russian federation |
19-06-2026 |
Carrying Out Construction Control At The Facility "repair Of The Medical Unit In The Building Of Mbdou "kindergarten No. 49 Of A Combined Type"" At The Address: Gatchina Municipal District, Shpankovo Village, Alexey Rykunov Street, 39" |
22-06-2026 |
| 77. |
Russian federation |
19-06-2026 |
Maintenance Of Automatic Entry Gate Drives |
22-06-2026 |
| 78. |
Kazakhstan |
19-06-2026 |
Building Material For Piles |
22-06-2026 |
| 79. |
Kazakhstan |
19-06-2026 |
Services For The Supply Of Drinking Water. Addresses: Tugambay, Toibaeva 3. Karatogan, Central 19 |
22-06-2026 |
| 80. |
Russian federation |
19-06-2026 |
Purchase Carriage Line 1008-36a-1 6hn28mdt For Vf Jsc "apatite" |
22-06-2026 |
|
Page Size
|
prev
Next
|