11921 Active Tenders For CIS Region

 

Tenders From Russia

The economy of Russia is the eleventh largest economy in the world by nominal value and the sixth largest by purchasing power parity (PPP).Stable economic growth of Russia resumed in late 2009 and 2010. Despite the deep but brief recession, the economy has not been as seriously affected by the global financial crisis. Stable and steady growth of Russia has created huge business projects world wide. There are numerous Russian Tenders, Tender Notification, Public Tender Notices, Public Procurements, Online Tenders, Bid Invitation, International Bid Offers, Business Proposals, Contracts and Russian Government Tenders afloat all over world.

Tenders from Russia listed below:

Total No Of Tenders - 1576
Countries Date Summary Deadline
61. Russia 14-08-2025 The Right To Conclude A Contract For The Delivery Of Waste Bags 20-08-2025
62. Russia 14-08-2025 Provision Of Services For Conducting In-kind Observations Of The Content Of Pollutants In The Atmospheric Air And The Physical Impact On The Environment For The Development Of A Sanitary Protection Zone Project For The Facilities Of The Central Production 20-08-2025
63. Russia 14-08-2025 The Implementation Of Construction, Installation, Commissioning Of New Construction: arrangement Of Kgs No. 9. Binding Of Wells No. 533 , Gas Pipeline Kgs No. 9-t. Vr. Uza 9.1 , Kgs Methanol Band No. 9-t.vr. Uza 9.1 " 25-08-2025
64. Russia 14-08-2025 Construction Of 0.4 Kv Vli From 0.4 Kv Ru Ktp Sev2511/400 Kva Stavropolsky District, Timofeevka Village (ronzhina N.m.) (turnkey) For The Needs Of The Branch Of Pjsc Rosseti Volga - Samara Distribution Networks 21-08-2025
65. Russia 14-08-2025 Construction Of 0.4 Kv Overhead Power Transmission Line From Support 204/5 F-2 Ktp Rv601/250 Kva, Stavropolsky District, Vyselki Village (samatova Yu.v.) (turnkey) For The Needs Of The Branch Of Pjsc Rosseti Volga - Samara Distribution Networks 21-08-2025
66. Russia 14-08-2025 The Right To Conclude An Agreement On The Diagnosis Of A Spindle Of The Vertical Caliper Ram D560 19-08-2025
67. Russia 14-08-2025 Reconstruction In Terms Of Replacing The Du208 Transformer Substation With A 160 Kva Transformer With A 10/0.4 Kv Transformer Substation With A 250 Kva Transformer And Reconstruction Of The 0.4 Kv Transmission Line In The Village Of Kultura From The Du201 21-08-2025
68. Russia 14-08-2025 Tender For The Execution Of A Complete Set Of Works (shipment, Installation And Launching) Of The Eom Corps No. 1 Balashik 28-08-2025
69. Russia 14-08-2025 Tender For The Execution Of A Complete Set Of Works (shipment, Installation And Launch-up) Of The Eom Systems For The Building No. 4-5 Senkin 28-08-2025
70. Russia 14-08-2025 Delivery: Plates For Heat Exchanger Ridan Nn No. 07 With A Set Of Seals (with Delivery: Leningrad Region, Kirovsky District, Otradnoye, Nikolskoye Highway 55) 09-09-2025
Page Size prev        Next